11.09.2018 | The inauguration ceremony for the new Celgene manufacturing plant in Couvet was held on 11 September 2018 in the presence of the various participants in the project. The new production complex is designed like a campus and built on the alluvial plain of the Areuse River. The volumetry of the buildings harmoniously blends into the architectural environment and open landscape characteristic of this area of Val-de-Travers. The result is a well-structured use of space, not only inside the buildings, but also outside them. The campus consists of several spaces that accommodate the various functions of the complex, and particularly an area combining the reception and company restaurant, another dedicated to the production workshops and administration, and a warehouse area for the stockage, commissioning and packaging of the products.